Kollam is also ready to be a part of the transmission/distribution network of KSEB by adopting a new technology by building a Gas Insulated Substation at the circle office compound. The stone laying ceremony will be conducted on 4th of September 2010 and this will be a milestone as well as a progress in the effort of reducing the interruptions especially under the area of Kollam division. Now here is an article which throws light in to the details of gas insulated substation which is not familiar to many of us.
Showing posts with label Reading. Show all posts
Showing posts with label Reading. Show all posts
Sunday, August 29, 2010
Thursday, August 26, 2010
DISTRIBUTION TRANSFORMER & IT'S MAINTENANCE
Sri.Syamkumar, Assistant Engineer in the Meter Testing Unit, Kollam has immense knowledge in the field of installation and testing of distribution transformers, energy meters, their maintenance, etc. He is a man of excellence so that we can depend him for our acquisition of knowledge in these fields. Here is an article through which he is sharing all the minute details about theory and construction of distribution transformers, their installation and maintenance etc., which we must know throughout our field life. Also this article is prepared so as to use as a quick reference as and when needed.
Tuesday, August 17, 2010
EARTHING WIRE
ഏറ്റവും സുരക്ഷിതമായി 11 കെ.വി., എല്.റ്റി. ലൈനുകളില് ജോലി ചെയ്യുന്നതിന് പ്രസ്തുത ലൈനുകള് ഏറ്റവും നന്നായി സുരക്ഷിതമാക്കേണ്ടതുണ്ട് . ഇതിനുള്ള ഏറ്റവും വലിയ തടസ്സം യഥാസമയം ഇത്തരം ഉപകരണങ്ങള് സമീപത്തുണ്ടാകില്ല എന്നതുതന്നെ-പ്രത്യേകിച്ചും സെക്ഷന് ഓഫീസില് നിന്നും ജോലിസ്ഥലം വളരെ ദൂരെയാകുന്ന സന്ദര്ഭങ്ങളില്. ഇതിന് ഒരു പരിഹാരമാണ്, കൊല്ലം ഡിവിഷനില് കടപ്പാക്കട സെക്ഷനിലെ ജീവനക്കാര് ഉണ്ടാക്കി ഉപയോഗിച്ച് വിജയകരമാണെന്നു കണ്ടെത്തിയ “എര്ത്തിങ്ങ് വയര്”. ദിനം പ്രതി അപകടങ്ങള് കൂടിവരുന്നതിന്റെ പശ്ചാത്തലത്തില് വളരെ എളുപ്പം അധികം ചിലവില്ലാതെ ഉണ്ടാക്കാവുന്ന ഈ ഉപകരണത്തെപ്പറ്റി ഒരല്പം.
Subscribe to:
Posts (Atom)




